Specialist Tymin's Job Change¶
You feel an arcane presence... 
This page or section may contain significant spoilers for Drehmal: Apotheosis. Read the additional messages below for specific spoiler information.
This article/section contains significant spoilers for the 75% completion event and its associated late-game areas.
Unless you have FINISHED the 75% Completion Sequence, ALL THE WAY THROUGH TO THE "Apotheosis" ADVANCEMENT, we strongly advise that you DO NOT continue to read this article, as this will interfere with your ability to discover crucial aspects of the map for yourself.
Found at the bottom of a staircase in the Ring Facility, this holotext establishes that the Ring Research Installation was originally a hydroelectric power plant, but was converted to a research facility when it was discovered that the warp magic derived from the rings could transport energy to the moon from Drehmal.
Coordinates¶
| X | Y | Z |
|---|---|---|
| -937 | 37 | -201 |
Image¶
Transcription¶
As soon as I flip this switch, hydroelectric power generation will cease! That was this facility’s original purpose, after all, as we had no practical way of piping primal energy off Drehmal and onto Lo’Dahr. As it turns out, we didn’t end up even needing to! With the discovery of the Numencore, we can draw all the primal energy we need locally and expand our enterprises here on the Divine Moon. As a power specialist, my job here is done. I’m now off to the Core Facility where my skills will continue to be used for the glory of Avsohm! Hail to Avsohm!

